Cabinet movement is locked to a set value
Introduction
In the plan view of CabMaster, you can typically move a cabinet freely by dragging it with your mouse. However, there may be instances when the drag function becomes restricted to specific values, preventing free movement.
Instructions
- There is a quick lengths movement tool in CabMaster Designer ribbon. You will find that your movement will be stuck with one of the values in your movement tool settings.
2. To free this, hold down the number pad value that is stuck, e.g. if your cabinet is stuck only allowing 500mm movements, then hold the 5 key on the number pad, then also press the 'Num Lock' key.
This will now allow you move your cabinet freely again
Related Articles
Creating a new Cabinet Palette in CabMaster
In CabMaster you can customise the Palette to suit your designing needs. Setting up the Palette with standard offerings makes it much quicker to complete regular drawings. The following video provides a walkthrough of the process. Step-by-step ...
CabMaster Version 11 opening older drawings from previous versions
Introduction Whilst Version 11 can open older CabMaster Drawings from V10.1 and backwards, this is not recommended as there are a lot unknown issues that could arise due to the improvements and bug fixes in the newer Version 11, versus those of the ...
Not able to open PDF Reports directly from CabMaster
Introduction Adobe has an Enhanced Security feature that will block PDF documents from launching if launched from a program running as Administrator (i.e.: CabMaster). To fix it, follow the steps below. NOTE: If you have attempted to run Adobe ...
CabMaster cannot find a library and cannot see F Drive or other mapped drives
Introduction If you encounter an error where CabMaster cannot locate a library or you’re unable to see mapped drives (like F: or others), you can follow the steps below to resolve the issue. In a standard setup of a Microsoft computer Elevated ...
Labour Pricing
Labour Pricing Before you commence setting up labour, it is important that we first describe the options that are available. Then we will move on and discuss each of the areas that may be involved in completing the labour pricing set up. Note: If you ...