Result: Since
“Cutting” is selected for the Part called “Bak”, the 10.00-minute time is
applied against the hourly rate. Therefore the labour cost of this part would
be $8.30.
Explanation of Edit Fields
Description: This field can be changed to whatever the user would
like to use to describe the Task being preformed.
Cost: This is the Per Hour cost of this task. A dollar
symbol must be used with all entries. If the value is 50 cents you need to
enter this as $0.50.
Impact: This field is used to
determine whether the Task is based on.
- By Cabinet will utilise the data that is stored at cabinet level.
- By Part will be calculated for each part that is selected.
Mode: This field nominates what cost rates are being used.
- By Area: Cost is calculated by the area.
- By Time: Cost is calculated by time (measured as
minutes).
Tutorial 2
Labour based on time taken to complete each task at cabinet level
The first thing we must do it determine the tables that we need to work
with.
Since we are working at Cabinet Level the Impact must be set to By Cabinet.
- Since the cost is based on Time the Mode must be set to By Time. (Refer Tutorial 1 for explanation of Description, Cost, Impact and Mode.)
Therefore we will be working with the following:
- Labour – Cost Rate Manager
- Labour page of the Labour & Construction category of the Cabinet.
In the Labour
& Construction category, on the Labour page, go through and nominate which tasks need to be performed along with the
time.